{"date":"2026-11-12","type":"CBOC","videoId":"rLkIOKSzLeY","audioDuration":4738,"speakers":{},"utterances":[{"start":3580,"end":19427,"speaker":"A","text":"Everyone ready? All right, uh, let's call the meeting of the Citizens' Bond Oversight Committee here Thursday, November 12th, 6 PM, uh, to order. And Olivia, if you could do the roll call, please."},{"start":19427,"end":20631,"speaker":"B","text":"Tony Hanning?"},{"start":20631,"end":21466,"speaker":"A","text":"Here."},{"start":21466,"end":22558,"speaker":"B","text":"Alan Hansen?"},{"start":22558,"end":23007,"speaker":"A","text":"Here."},{"start":23007,"end":24019,"speaker":"B","text":"Rick Hunter?"},{"start":24019,"end":24356,"speaker":"A","text":"Here."},{"start":24356,"end":25415,"speaker":"B","text":"And Carl Landers?"},{"start":25415,"end":172087,"speaker":"A","text":"Here. All right, so 4 of 4 members are represented, so we have a quorum. Thank you all for coming this evening. Um, we're gonna review the agenda here, uh, but as a reminder, tonight's meeting is covering the fiscal period of, uh, July, August, September. Correct me if I'm wrong, Erica. Uh, yes. Um, so even though we had a meeting a month ago, that was the previous quarter. So, um, Item 2, changes to the agenda. Does anyone have any requested changes tonight? Tonight's agenda? Not hearing any. Is there a motion to approve the agenda? Thank you. Second? Second. All in favor? Aye. Okay, unanimous on that. So that moves us into public comment. And is anyone on Zoom? I don't see anyone here in the audience. Olivia, anybody in the Zoom? Nope. Okay. So we will move past public comment into our action section. And first up is 4.1. So the minutes of the October 8th meeting were distributed. Thank you, Olivia, again for your detailed notes on the meeting. Any motion to approve the minutes? Motion to approve. Second from someone? Second. Thank you. Any discussion on the minutes from last time or corrections? Okay. I'm sure you caught the video recording, though. All right. All in favor of approving the motion to approve the minutes? In favor, aye. Okay, 3 approved, 1 abstention. Right, that takes us to action 4.2. With Jen's resignation from the committee, we have an opening for the vice chair, and so Per our bylaws, we do need to elect a replacement. So would anyone like to, uh, open up the discussion on a vice chair or volunteer themselves?"},{"start":172087,"end":197944,"speaker":"C","text":"I am willing to do it. We have talked, uh, very briefly, um, but I do not know if I'd be able to take over the chair next June when you, uh, when So if somebody else would like to be vice chair and thinks it's more likely that they would want— would be chair next June, I'd be happy to have that— for that to happen."},{"start":197944,"end":217666,"speaker":"A","text":"And as a reminder, don't forget to press the red light button on your microphone when speaking. But I think we caught it. Thank you. Interest, interest."},{"start":217666,"end":237470,"speaker":"D","text":"I would be happy to. I share— I have a similar interest to you, Carl. You're hard. You're a hard seat to follow."},{"start":237690,"end":237918,"speaker":"C","text":"You"},{"start":238456,"end":252879,"speaker":"D","text":"know, with your breadth of knowledge and history with the, with the city, I wouldn't mind as well stepping into vice chair. And I would yield to you with the more experience to preside as president."},{"start":252879,"end":261674,"speaker":"C","text":"Would you, would you likely be interested in becoming chair next June or July?"},{"start":261674,"end":292072,"speaker":"D","text":"I would likely support you being— Wow. It seems like there's so much meat within history with these measures that Carl brings to the table, you know, so it nearly takes the full year to understand the breadth of this. And with your CPA background as well, the numbers don't fly out to me like they might with you. Right."},{"start":293228,"end":356566,"speaker":"A","text":"Well, let me just share a few comments. One, I was just like you all, a newbie at one point. So that wisdom only comes with years of meetings. Secondly, the role of the chair shouldn't be like chief holder of knowledge and questioner. All of you should be playing that role regardless of your title. The key role of the chair is to, one, And we're getting ahead of ourselves because the chair is next June that we would vote, but I know what you're thinking. So role number 1 is work with Olivia to get the agenda out for each meeting. So you may have input on additional agenda topics. Role 2, obviously run the meeting. Role 3, get the annual report written. Doesn't mean that you have to write it. The chair has in the past, but it could also be delegated to someone else. So I don't want you to think of— at least when I think of the chair role, it doesn't mean that you have to be the smartest person in the room or the expert or whatever. You just have to be willing to organize the committee and keep it running."},{"start":361017,"end":371990,"speaker":"C","text":"So— I would be happy to do it unless Alan would— No. Confine with the— Your service. Okay, thank you."},{"start":371990,"end":378368,"speaker":"A","text":"Would someone like to make a motion then to elect Rick Hunter as the vice chair?"},{"start":378368,"end":384528,"speaker":"D","text":"I would like to make a motion to elect Rick Hunter as vice chair."},{"start":384528,"end":393956,"speaker":"A","text":"I will second that. All right, and Rick, you are allowed to vote for yourself. So all in favor of Rick as vice chair?"},{"start":394496,"end":394545,"speaker":"C","text":"Aye."},{"start":394725,"end":476361,"speaker":"A","text":"Okay. Rick is now the vice chair with a vote of 4 to 0. Congratulations. Your t-shirt will be shipped to you in the mail. Okay, so that takes care of our action items for tonight's agenda, and that moves us into the information and discussion section of the agenda. So, as a reminder, and Rick, you missed the last meeting. It was somewhat a milestone in that we completed the oversight of Measure T because there is no money left in the Measure T fund as of the period that we reviewed last. The balance is 0. There are no funds. And the projects that are running under Measure T are really funded by other sources. And so, which is the solar project, which is also wrapping up. So we're not— we're not reviewing Measure T any longer. We still need to write the final annual report because there was expenditure in this fiscal year. But there is no— correct me, that may not be true. Was there expenditure from Measure T this fiscal year, Erica?"},{"start":476361,"end":485031,"speaker":"C","text":"I—"},{"start":485627,"end":486513,"speaker":"A","text":"oh, sorry, Erica."},{"start":486513,"end":490283,"speaker":"E","text":"July 1st, 2026, in Fund 40."},{"start":490283,"end":497676,"speaker":"A","text":"Okay, so at the end of last fiscal year, any money was moved into Fund 40, which is not a bond fund?"},{"start":497676,"end":498274,"speaker":"E","text":"Yes."},{"start":498274,"end":499680,"speaker":"C","text":"What is Fund 40?"},{"start":499680,"end":509354,"speaker":"E","text":"The special reserve fund, capital facilities fund. We use the state facilities funds."},{"start":509354,"end":511538,"speaker":"C","text":"But that doesn't count on Measure T."},{"start":511538,"end":516420,"speaker":"E","text":"State reimbursement funds were deposited to Fund 40, and then we use that money."},{"start":516420,"end":520788,"speaker":"C","text":"Huh. But that's no longer considered Measure T?"},{"start":520788,"end":521912,"speaker":"E","text":"Yes, it's not."},{"start":521912,"end":529154,"speaker":"C","text":"Okay. Yeah, because, because I— there is $1.8 million here in the materials we have, but that's not Measure T."},{"start":529154,"end":532543,"speaker":"E","text":"Yes, it's paid out of Fund 40 now."},{"start":532800,"end":535200,"speaker":"C","text":"Okay, good."},{"start":535200,"end":541880,"speaker":"A","text":"Yeah. So the point I was making— what was the point I was making? Oh, so we're not reviewing Measure T anymore. That's—"},{"start":541880,"end":543040,"speaker":"C","text":"That was going to be one of my questions."},{"start":543040,"end":543660,"speaker":"A","text":"That's the point."},{"start":543660,"end":544550,"speaker":"C","text":"Yeah, yeah. Is there anything left?"},{"start":544550,"end":555920,"speaker":"A","text":"So there's nothing left in there. In fact, you included some Fund 40 reports, but this committee has no oversight on Fund 40. So I think you don't have to provide them anymore."},{"start":555920,"end":557720,"speaker":"E","text":"Oh, okay. I wasn't sure about that."},{"start":557720,"end":572238,"speaker":"A","text":"But thank you for including it. But we can clarify this evening that Fund 40, the funds that are in Fund 40, which is a capital fund that's paying for the solar project did not come from Measure T. And so they're not under our oversight. All"},{"start":573051,"end":573324,"speaker":"C","text":"right."},{"start":573324,"end":579495,"speaker":"A","text":"There was some Measure T funds that were used for solar, but they were all expended last fiscal year."},{"start":579495,"end":584609,"speaker":"E","text":"Everything is tracked in Fund 40 right now, all the solar phase 2."},{"start":584609,"end":586821,"speaker":"C","text":"Oh, all the solar, you said?"},{"start":586821,"end":587078,"speaker":"E","text":"Yes."},{"start":587078,"end":587334,"speaker":"C","text":"Okay."},{"start":587815,"end":618854,"speaker":"A","text":"So we got a final report from Will Robertson from Cummins, is it? They changed the name. Cummins was the bond program manager for Measure T. He was at the last meeting, gave an overview, closed out— the solar project is not closed out, but the Measure T funding for it is closed out. And so we wished him well, thanked him for his years of oversight of Measure T, which I think was 12 years or 11 years maybe. And now we're just solely focused on Measure S."},{"start":618854,"end":619416,"speaker":"C","text":"Right."},{"start":619416,"end":649995,"speaker":"A","text":"So as we go through tonight, We're really looking at Measure S exclusively and going forward. So that makes the committee and the future chairperson's job 50% easier. All right. So let's get into it. Is there a report on Measure S progress 5.1, and who's providing the report? I don't see anyone from Van Pelt here."},{"start":650187,"end":651213,"speaker":"F","text":"They're on, they're online."},{"start":651950,"end":652158,"speaker":"A","text":"Oh, they are?"},{"start":652971,"end":653472,"speaker":"G","text":"Hi, Carl."},{"start":653712,"end":654626,"speaker":"F","text":"Carl. Yeah."},{"start":655235,"end":800829,"speaker":"G","text":"Ah, it's, it's Eric. Good evening, everyone. Sorry, uh, sorry I couldn't be there. I, I'm out of town, and Nick's— it's senior night, and Nick's daughter is playing her last sports game, so he's attending that. Um, so, uh, so I'm sitting in, I'm sitting in for Nick, and I, I was out of town, but I wanted to be here with you guys to talk about it. So Um, no, uh, excuse me, no PowerPoint because much of the pictures will be the same since we met so recently. Um, but now we are wrapping up, um, the Phase 2 projects. We're in the financial closeout phase right now with, uh, with the Block Construction. I'm happy to report, um, actually yesterday— or I'm sorry, Tuesday, because yesterday was a holiday— we, uh, we believe we've gotten to the final number with Block where we're going to get about a $3.2 million credit back on their contract, um, for Unused funds, so that will come back and be removed from their contract. We are also in the process of planning for phase three, which is board approved. Those drawings are at the Division of the State Architect for approval, and block or I'm sorry, not and like I said, we're wrapping up the contract with block construction. We also, in this— in the period since we last spoke, we have— we're completing the RFP process for the Phase 3 contractor, and we'll be bringing that to the Board of Trustees for approval at the next board meeting. And then we will start pre-construction services with that contractor, start doing site investigation and planning for the HVAC projects that are next summer. Thank you. So lots of planning going on right now and lots of wrap-up. We did at the last board meeting, we did a presentation on the facilities master plan update and also the state facilities funding work that we are starting. So that's working in conjunction with the master plan and also the district's— The district's— So we're going to kind of work in tandem with that enrollment study, with the Facilities Master Plan and the state funding plan."},{"start":800829,"end":825495,"speaker":"A","text":"Thanks, Eric. Could you give more of an overview of what's happened since the last meeting? Because basically there's been essentially a shift to going back and re-updating the Facilities Master Plan, which was signed off, I think, last year by the board. So yeah, if you could just give an overview what was presented. Yeah,"},{"start":825624,"end":921666,"speaker":"G","text":"no problem, Carl. The first thing to note is that the state issued new rules for state funding to school districts about 3 months ago. Those rules changed the requirements for school districts and their master plan. It required more documents and more detail in them. There's a list of about 15 new documents that it requires more information, more information to be included as well. So that is part of this. We— so we're going to take that and we're going to update the master plan to be in compliance with state law and regulations in order to make sure that we can maximize and get any state funding that the district will qualify for. In In parallel with that process, there was kind of 2 tracks that we presented at the board meeting. One track is these kind of quick-start projects where we can come to a consensus on what projects can start immediately and get those going as part of this master plan process. And then also in conjunction, working with the enrollment, the enrollment work that the district's doing on the other side of the house. Working in to make a long-term plan. So we, so we make sure we're investing in the right spots where, where, where the enrollment is, is making, is causing the need for facilities improvements."},{"start":921666,"end":932835,"speaker":"A","text":"And what's the time schedule then for this redo of the facilities master plan and when it would be presented back to the board?"},{"start":934286,"end":945099,"speaker":"G","text":"Yeah, the update to the facilities master plan we want to present back to the board before anybody goes on break. So the plan is to get it back to the board before June."},{"start":945099,"end":948750,"speaker":"A","text":"Before when? June?"},{"start":948750,"end":949927,"speaker":"G","text":"Before June. Yep."},{"start":950411,"end":950717,"speaker":"A","text":"Okay."},{"start":953110,"end":984349,"speaker":"G","text":"More— there'll be some more outreach to the campuses and to the community. And, and there'll be several other meetings that, that are held in order to produce these documents. And also a key part of this, like I said, actually, the kind of guiding— the guiding part of this is compliance with the new state regulations. Where there's some state funding eligibility that the district's in line for, and in order for that, we have to comply with the new regulations."},{"start":986087,"end":995063,"speaker":"A","text":"And then there's a— you got to pay for this, right? So did the board— how much did the board approve for architects to do this master plan redo?"},{"start":995063,"end":1043484,"speaker":"G","text":"If you could give me just 1 second, I will pull that up. I didn't have it right in front of me, but I will tell you exactly. It's— it was in the $200,000 range, but I don't know the exact number. So just give me 1 second and I'll tell you. One second, I'm almost there."},{"start":1056409,"end":1057895,"speaker":"F","text":"218809."},{"start":1057895,"end":1060415,"speaker":"G","text":"Thank you. Okay."},{"start":1061775,"end":1068426,"speaker":"A","text":"And that buys basically a process to update the master plan per what Eric was just describing."},{"start":1068426,"end":1069006,"speaker":"F","text":"That's correct."},{"start":1069006,"end":1076163,"speaker":"A","text":"And delivers June for the board. Correct. And then that restarts the process of planning how the rest of the money would be spent."},{"start":1076163,"end":1076455,"speaker":"F","text":"Correct."},{"start":1076455,"end":1077185,"speaker":"A","text":"In Measure S."},{"start":1077185,"end":1078158,"speaker":"G","text":"Correct."},{"start":1078158,"end":1125317,"speaker":"A","text":"Okay. We did have a discussion at the last meeting, you'll recall, Eric, about Why we are— why you and the board are, are not more aggressively doing the HVAC projects, given that the costs go up every year, and you know that you have additional schools even after next summer. There's another round and then maybe another round to get the charter schools. Has there been any further discussion with the bond committee and the board about accelerating those to, to basically reduce the overall cost? Since those, you know, you're going to do the HVAC in these other schools, why not do it sooner rather than wait, you know, years more?"},{"start":1125317,"end":1164053,"speaker":"G","text":"Yeah, that was, that was definitely one of the conversations that we had, that we had when we put together the master plan presentation, and we talked about that as being one of the quick-start decisions of how many HVAC projects can we do in, what is it, it's going to be Phase 4 now, in Phase 4 to try to keep the cost down. So that was part of that discussion. We will pick the campuses for Phase 4 as part of this conversation and this master plan, and it will likely include a big number of campuses for Phase 4."},{"start":1164053,"end":1180259,"speaker":"A","text":"I mean, is the— sorry, if you have questions, just jump in. Is there a possibility in this enrollment study— I don't know, Mike, maybe you can speak to this, or Martin— that Campuses will be closed and thus don't need HVAC?"},{"start":1180259,"end":1194623,"speaker":"D","text":"May I answer that? We haven't discussed that as a board, but certainly that's a possibility. When you look at the enrollment numbers, you can see that there are school sites that are small."},{"start":1195399,"end":1211050,"speaker":"H","text":"And so, you know, it may not make sense, but we haven't discussed any of the options yet. The process starts with gathering, you know, talking with the community, getting to see where the sites are. reviewing the numbers and go through there. But no options on the table, no options off the table."},{"start":1211050,"end":1222225,"speaker":"A","text":"Okay. So the timing of this is important, is critical, right? You wouldn't want to decide to put HVAC in a school that gets consolidated."},{"start":1222225,"end":1260115,"speaker":"H","text":"Again, we haven't discussed that. But I would say that's not totally true because the building still exists. It's still something that needs maintenance. And Many of the sites that were closed as part of the 2019 reconfiguration are being used and are continuing to have, you know, life and action inside of it. And so HVAC upgrade can have benefits even if it's not just— it's still a school, it's still a district property, it's still a district building. So again, this hasn't been discussed. I'm just saying that, you know, I wouldn't jump to the conclusion that it's going to go one way or the other based upon that."},{"start":1260977,"end":1262188,"speaker":"A","text":"Got it."},{"start":1265190,"end":1270727,"speaker":"C","text":"Okay. This is general. Are the enrollment projections continuing to go down?"},{"start":1270727,"end":1371985,"speaker":"H","text":"So the demographer's data says that enrollment projections continue to go down. In the last few years, we've been holding steady, actually even a little bit higher than what we anticipated. A lot of that due to TK enrollment, as you may or may not know. Over the last few years, TK enrollment has been phased into the schools to now where we are doing universal TK for everyone that's 4th grade or 4 years old are able to come in and participate in TK. So it's a little bit hard to know exactly where the demand is going to be and what it's going to look like until people come in and look at it. The expectation is that we sort of hit peak TK. And it'll start to reduce. But we thought that was going to happen this year, and we opened up 2 more, 2 more, 3 more, 2 more classrooms, I think, of TK than we even expected last year. So it's, you know, I mean, but you're dealing with like, you know, 40, 40-kid difference. So in a 6,000-school district, you know, like 40 kids is a lot for TK. That's 2 classrooms that can be really impactful to a site. But in the projection of is it going to be 6,300 or 6,260? You know, like that's kind of in the realm there that you see in that kind of fluctuation. But I think the demographer projections said something like 2035, it would be 5,500 students. And the trend has been since 2019 was, I think the district was at around 7,500 in 2019. Obviously, the pandemic had a major impact on enrollment across California. But, you know, that's almost 1,500 students lower. In the past 7 years."},{"start":1374132,"end":1389952,"speaker":"A","text":"And there was a presentation to the board 2 months ago, maybe about enrollment, or a month ago, that showed each school site and where it's currently at. And there are some schools that are, I think, as low as 25% of capacity, maybe, or— Yeah,"},{"start":1390582,"end":1391325,"speaker":"H","text":"correct me if"},{"start":1391325,"end":1391438,"speaker":"A","text":"I'm"},{"start":1391486,"end":1500802,"speaker":"H","text":"off, but yeah, so the capacity number is just based upon raw number of students that could fit into a classroom, but it's not totally true. Like, we have special day classes that can only have You know, maybe 12 students in that classroom at all, but that still counts as a capacity of 30. We have classrooms that we dedicate to partner programs because we have this awesome extended day. The state of California has really been investing in extended day and having that be integrated as part— really be an extended day program, not an after-school, and making it be integrated. And so our partners need— sometimes they need classrooms to stage in and use it. So. Okay. The numbers are— they accurately reflect the peak capacity if every classroom were filled to contract limit to be able to do that. But then you'd lose all of these other things that are really part of making a school work day to day. I'll also point out that our TK classrooms can only have 20 students in them. So that's, that's another limitation on it, even though that I believe that when we do capacity, we'll still call that classroom able to go to contract max, which is 31, even though the— when in that use being deployed as a TK classroom, it can only take 20. So, but it is true. I'm not trying to minimize the fact that, yes, there are sites that are very underutilized given the space that they have available. But, you know, seeing 50% is not— that's not that outrageous either, because it means that you have class— it might mean you have classrooms that are at 25. Yeah. Not the 31, and then you have a couple classrooms dedicated to much more restricted class sizes. You have one for a family center that's been converted into a family center. You have one for partners. So there's a lot of use that the school campus gets. It provides— Yeah. I mean, it's community school, right? It provides a lot of opportunity for families that's beyond just the day in the classroom."},{"start":1506592,"end":1515945,"speaker":"A","text":"All right, anything else for Eric? How many schools, Eric, are teed up for next summer for HVAC? Is it 3? 2. 2."},{"start":1516447,"end":1517434,"speaker":"G","text":"Yep, next summer is 2."},{"start":1518809,"end":1571782,"speaker":"A","text":"Okay, uh, I know this is a sensitive topic with Eric on the line, but given that we aren't running any major projects, it's 2 HVAC projects next summer. Has there been any discussion With the board or the bond committee about reducing or renegotiating the contract with the bond program manager? Because we're spending $200,000 a month or $2.4 million a year for VP— sorry, VPCS, and we're not really building anything. So, is there an opportunity to save some bond money by scaling back the contract? Until the facilities master plan is redone and we, you know, hey, we're going to go build this 3 buildings or whatever, and we need the full power of our bond program manager."},{"start":1571782,"end":1608333,"speaker":"F","text":"Yes, Carl. So that's something that Rick and I have been talking about. And we would come back. And let the board know if we go that direction. But as of right now, I know that we've been busy prepping for the new— for the summer, upcoming summer, prepping for the FMP. You know, there's a lot of behind-the-scenes stuff that's happening with them right now. To be able to—"},{"start":1608366,"end":1625265,"speaker":"A","text":"how utilized is The bond program management team then with 2 sites coming up in a facilities master plan refresh that you're paying an architect to do, they're not doing it. So are you using $200,000 a month of services from them?"},{"start":1625265,"end":1631006,"speaker":"F","text":"Pretty much. Yeah."},{"start":1631006,"end":1636760,"speaker":"A","text":"And you don't see an opportunity to maybe make it $100,000 a month, or—"},{"start":1636760,"end":1637730,"speaker":"F","text":"Like I said, there's possibilities."},{"start":1638158,"end":1638318,"speaker":"A","text":"Okay."},{"start":1638318,"end":1639827,"speaker":"F","text":"And that's something that we're looking at."},{"start":1639827,"end":1650658,"speaker":"A","text":"Okay. Because if we were building, like in Measure T, at when it— at its peak, there was major construction going on at 4 campuses, was it?"},{"start":1650658,"end":1651701,"speaker":"F","text":"3."},{"start":1651701,"end":1661923,"speaker":"A","text":"3 campuses. And basically you had the same bond program management overhead that we have for— We had 2. What's that?"},{"start":1661923,"end":1665565,"speaker":"F","text":"That was 2 different bond program management companies at the time."},{"start":1666000,"end":1666387,"speaker":"A","text":"Oh, there were?"},{"start":1666387,"end":1667419,"speaker":"F","text":"Yeah."},{"start":1667419,"end":1672626,"speaker":"A","text":"Okay. Who was the other one? It was RM— RGM Kramer."},{"start":1672626,"end":1679084,"speaker":"F","text":"Kramer. And then we had— gosh, I can't think of his name. Do you remember? Oh, Bresford. Bresford."},{"start":1679438,"end":1686853,"speaker":"A","text":"Okay. Well, I put the question out there. Um, it would be great if you, if you could at least,"},{"start":1687579,"end":1687821,"speaker":"F","text":"yeah,"},{"start":1688870,"end":1698942,"speaker":"A","text":"bring up the topic. And because probably what's going to happen is I think the contract with the BPCS is a 5-year contract, and we're probably in year 3 now, right?"},{"start":1698942,"end":1699327,"speaker":"F","text":"Right."},{"start":1699327,"end":1703381,"speaker":"A","text":"So at some point, that contract isn't going to be long enough,"},{"start":1704005,"end":1704134,"speaker":"F","text":"right?"},{"start":1704230,"end":1713811,"speaker":"A","text":"If there's a facilities master plan in June, and then the board authorized some projects and they start a year from now, they're going to take 5 years. You're going to need to extend their contract, right?"},{"start":1713811,"end":1714308,"speaker":"F","text":"Correct."},{"start":1714308,"end":1733801,"speaker":"A","text":"So it seems prudent to at least see if you can maybe reduce the cost now and extend the life. Because they're not doing the services they were contracted for. The assumption would be we'd be building a bunch of buildings, and that's why we needed a $2 million a year bond program manager."},{"start":1733801,"end":1741763,"speaker":"E","text":"So the contract runs until fiscal year '28-'29, November 8th, 2028."},{"start":1741763,"end":1752035,"speaker":"A","text":"Okay, so we're halfway through then, basically. Yeah. All right, well, thanks for the consideration at least. Anyone else?"},{"start":1752035,"end":1755595,"speaker":"D","text":"There were 3 facilities done last summer, is that correct?"},{"start":1755595,"end":1758546,"speaker":"F","text":"No, Carl was— well, yes, for the HVAC."},{"start":1758866,"end":1759748,"speaker":"D","text":"Yeah, that's correct."},{"start":1760069,"end":1760149,"speaker":"F","text":"Yeah."},{"start":1760149,"end":1763244,"speaker":"D","text":"And were those larger facilities?"},{"start":1763244,"end":1763581,"speaker":"F","text":"Yes."},{"start":1763581,"end":1769674,"speaker":"D","text":"And are there smaller facilities for the 2 that were— are coming up this summer?"},{"start":1769674,"end":1789723,"speaker":"F","text":"It depends. So Kennedy is one of the biggest schools that we have. Over 80,000 square feet. We have Roy Cloud, which is 70, so a few classrooms below that. Orion, obviously really smaller. So they all varied in sizes, right?"},{"start":1789723,"end":1795251,"speaker":"D","text":"And there's, I believe, what, 9 more to go, or was it 7 more to go?"},{"start":1795251,"end":1796902,"speaker":"F","text":"So we did— so we have—"},{"start":1797399,"end":1799017,"speaker":"A","text":"there were 4 the first summer, right?"},{"start":1799081,"end":1800090,"speaker":"F","text":"Yeah, 3 the"},{"start":1800139,"end":1800539,"speaker":"A","text":"second"},{"start":1800603,"end":1802703,"speaker":"F","text":"summer, 7, and then we have 2 more,"},{"start":1803169,"end":1803474,"speaker":"A","text":"which is"},{"start":1803506,"end":1806059,"speaker":"F","text":"9 out of, uh, we have 16 sites."},{"start":1806059,"end":1807167,"speaker":"D","text":"16 sites."},{"start":1807167,"end":1807953,"speaker":"F","text":"16 sites."},{"start":1807953,"end":1811839,"speaker":"D","text":"So we would, after these next 2, we'll be at 9 total?"},{"start":1811839,"end":1812176,"speaker":"F","text":"Correct."},{"start":1812176,"end":1815628,"speaker":"D","text":"Why is it only 2 coming up this summer?"},{"start":1815628,"end":1819593,"speaker":"F","text":"That's what we planned for, uh, the year before."},{"start":1819593,"end":1820685,"speaker":"D","text":"Oh, okay."},{"start":1820685,"end":1825293,"speaker":"F","text":"Yep, just because we weren't— we didn't have the— well, we had a facilities master plan, right?"},{"start":1825501,"end":1825710,"speaker":"D","text":"Right."},{"start":1826128,"end":1830636,"speaker":"F","text":"Uh, but we had to plan for something. At that time, and we did."},{"start":1830636,"end":1838619,"speaker":"D","text":"Would there be a— and is next year still in the works as far as how many facilities?"},{"start":1838619,"end":1843540,"speaker":"F","text":"Well, this for next summer is already— we already allocated all the stuff that we need to. It's already in DSA."},{"start":1844021,"end":1844037,"speaker":"D","text":"Uh,"},{"start":1844806,"end":1855611,"speaker":"F","text":"um, yes. Can we add another one? I think would be kind of late in the game, but I don't know. You know, because I guess the question right now takes a long—"},{"start":1855611,"end":1861452,"speaker":"A","text":"Is that every year that you wait to do HVAC in a school campus, the cost Absolutely."},{"start":1861452,"end":1862052,"speaker":"F","text":"Yeah, correct."},{"start":1862052,"end":1875588,"speaker":"A","text":"So when the board said 3 years ago, let's put HVAC in, were they imagining that it was going to be a 6-year project to get there? I mean, if we did 4 the first summer, why couldn't we do 4 the next summer and 4 the next summer, and then 12 would be done instead of 9?"},{"start":1875588,"end":1891051,"speaker":"F","text":"Right, right. Well, at the time, uh, we were doing the— we were— it was a combination, right? We're doing the facilities master plan as well, right? So we had to start with something. That, that first summer, which was— this was—"},{"start":1891164,"end":1897152,"speaker":"A","text":"but you started with 4 and you're going down a site each summer. It's going the opposite direction in terms of saving money."},{"start":1897201,"end":1900045,"speaker":"F","text":"Yeah, that's what— that was what we planned at that time."},{"start":1900045,"end":1927927,"speaker":"D","text":"With the future ACs going into schools, are they going to prioritize schools? Because I know, um, Mike had mentioned, well, it's a It's a building is the building, and they could use the AC. Are they going to focus solely on schools, or might one of those schools that's coming up on one of the plans that are destined for low enrollment still receive?"},{"start":1927927,"end":1967607,"speaker":"F","text":"Well, we're planning alongside with Dr. Wakaba's vision, right? So we're working alongside with the enrollment Taking those into consideration and our facilities master plan. And then this upcoming new— with that Prop 2 that was— that we have to follow now with the new FMP. This is where we brought in QKA to assist us with to figure out what are the next steps, right? We're going back out to the communities, we're going back out to the schools and see how we restructure everything for the To bring back to the board for approval."},{"start":1967607,"end":1979007,"speaker":"D","text":"So might the vision actually change where we would stop at 3, 7, 9 schools, or maybe 11 schools, and shift to a different priority that isn't HVAC?"},{"start":1979007,"end":1995308,"speaker":"F","text":"No, I think one of the priorities back in 2022 was HVAC, which was the climate. That was one of our priorities. Throughout the district that we heard from the parents and from the community."},{"start":1995308,"end":1996658,"speaker":"D","text":"Yeah."},{"start":1996658,"end":1997220,"speaker":"F","text":"Yeah."},{"start":1997220,"end":1999181,"speaker":"D","text":"Thank you."},{"start":1999181,"end":1999566,"speaker":"F","text":"Yep."},{"start":1999566,"end":2039554,"speaker":"A","text":"I guess I'll just share, you know, my frustration that the board approved— the bond was passed in 2022. The top priority from the board was put HVAC in the schools. Correct. Next year will be 2027. We'll only be halfway through, and every year it gets more expensive. There could have been a much more aggressive approach. The board already said we want HVAC in every facility. The money was already approved by the taxpayers now 5 years ago or 4 years ago. And it's just going to cost a lot more because of the slow process of rolling this out, and we're paying for bond program manager. Are we really pushing to drive this as fast as possible?"},{"start":2039554,"end":2044387,"speaker":"F","text":"Yes. Yes, we are."},{"start":2049129,"end":2068113,"speaker":"A","text":"Okay. I mean, I respect your answer, but I'm still frustrated about it because I think, you know, Measure T moved so much faster to get real buildings built and work done. And we're in a highly inflationary time. That's the killer here is that we've seen that these things go up 20% a year in cost."},{"start":2068113,"end":2073955,"speaker":"F","text":"So what do you think is the difference between Measure T and Measure S in your eyes? You were here, Measure T?"},{"start":2073955,"end":2081870,"speaker":"A","text":"Well, I was not here for— I only came in at the tail end of the big projects, you know, 5 years ago. So I wasn't here for the planning and the initiation."},{"start":2081870,"end":2091615,"speaker":"F","text":"So if I'm not mistaken, we had a facilities master plan that had took some time, right? We had a facilities master plan that was approved. There was no obstacles at that time."},{"start":2091615,"end":2094072,"speaker":"A","text":"For Measure T, you're saying?"},{"start":2094072,"end":2101521,"speaker":"F","text":"Measure T. Yeah, right. So there was no, no heat, right? There was no temperature we needed Cool the classrooms down. We didn't have that."},{"start":2101521,"end":2110688,"speaker":"A","text":"But for Measure S, whether there was a facilities master plan or not, the board said we want HVAC in every school. You didn't have to do a facility master plan."},{"start":2110688,"end":2119485,"speaker":"F","text":"Right. And we did. We put AC in every classroom at the time. That was temporary. Right. While we worked to get permanent AC."},{"start":2119485,"end":2132165,"speaker":"A","text":"Yeah. I think the frustration, Martin, is the pace because of the escalating costs. It was already— the board already said do it. It didn't have to wait for a facilities master plan. Okay, right."},{"start":2134316,"end":2134657,"speaker":"F","text":"Okay, fair enough."},{"start":2134657,"end":2157966,"speaker":"C","text":"Well, so I, I think what you're saying is really, is like, you know, there's always a cost for delay and a cost for accelerate, right? And I think we really need to sharpen pencils in terms of what you're suggesting, Carl, is the acceleration you The cost would be less than delaying stuff."},{"start":2157966,"end":2174857,"speaker":"A","text":"Assuming that, you know, you can actually do it, right? Right. That you have enough manpower and you have enough equipment and you have enough oversight and such. I mean, you did lighting in every school in 1 year."},{"start":2174857,"end":2175958,"speaker":"H","text":"Correct."},{"start":2175958,"end":2185050,"speaker":"A","text":"Right? And that was a fixed-price contract, $17 million, replace every fluorescent fixture with LED. It was done in 1 year."},{"start":2185050,"end":2187824,"speaker":"F","text":"A little over a year, but yeah."},{"start":2187824,"end":2212049,"speaker":"A","text":"Okay. But, and it was a fixed price, right? So if the cost went up for the contractor, they had to bear the cost of that, right? We're in a different situation here. For every school is rebid, you know, 9 months before the school, and we suffer from the inflation costs of the equipment and the people power to do it. Yeah."},{"start":2212049,"end":2215967,"speaker":"C","text":"I think, Carl, what you're really asking, if like an analysis would be—"},{"start":2216448,"end":2235187,"speaker":"F","text":"could be done to say, okay, if we did, you know, 6 schools of first-year sites or whatever number it is, like what's the cost of like this delay of a couple sites or 4 sites or 3 sites or 2 sites or whatever it is, right, over time? Because there's a cost."},{"start":2237017,"end":2241209,"speaker":"A","text":"Well, we already know the cost for the schools that were done in year 2."},{"start":2241209,"end":2242076,"speaker":"F","text":"Yeah."},{"start":2242076,"end":2245112,"speaker":"A","text":"They were more expensive than the schools that were done in year 1."},{"start":2245112,"end":2245594,"speaker":"F","text":"Yeah."},{"start":2245594,"end":2256049,"speaker":"A","text":"And we're about to get, I think, bids for year 3, right? And we're going to find out, guaranteed, they're going to cost more than the ones in year 2. So you don't even have to do much analysis. It's right there in black and white."},{"start":2256049,"end":2258185,"speaker":"F","text":"Right. It's a 5-minute exercise."},{"start":2258185,"end":2262890,"speaker":"A","text":"Yeah. But, you know, hindsight is wonderful. We can't change the past."},{"start":2262890,"end":2263228,"speaker":"F","text":"Right."},{"start":2263228,"end":2329395,"speaker":"A","text":"I think the request is The goal of this committee is to make sure that the taxpayer money is spent in the best possible way and that cost savings measures are addressed. It seems plain to me that if we could more aggressively do these schools that are already— the board has already said, go do it. You don't have to wait for an architect to say it should be part of the plan. It's already approved. Push it faster so that in the end, A, the students benefit from having real HVAC as opposed to portable things. That's a good thing. But B, it saves the taxpayers money because of inflation. That's all I'm saying. And now, given that the facilities master plan is being relooked at, does it buy you some time, Martin, to spend the time now to more aggressively get the HVAC done? You don't have any competing projects right now. Lighting is done, right? There's only one active project, which is HVAC. Could it be done? Could it be pushed faster? Yep. All right."},{"start":2329395,"end":2330889,"speaker":"D","text":"Yes, it can. Or— No,"},{"start":2331612,"end":2338733,"speaker":"F","text":"I mean, we, we can, we can, uh, like Eric was mentioning, we can, we can add more for the following year, for the next summer, right?"},{"start":2338733,"end":2340099,"speaker":"D","text":"2028."},{"start":2340099,"end":2345376,"speaker":"F","text":"2028. Yeah."},{"start":2345811,"end":2354562,"speaker":"A","text":"Okay. Thank you. Sure. All right. Anything else in the general topic of Measure S?"},{"start":2354562,"end":2357646,"speaker":"F","text":"Oh, I just had a clarifying—"},{"start":2357646,"end":2359964,"speaker":"A","text":"Before we get into the reports. Yeah, go for it."},{"start":2359964,"end":2371149,"speaker":"F","text":"So when the contractors you were mentioning like 20 minutes ago, they're going to— the amount that was going to come back for this phase, so that just gets replenished for next phase, right?"},{"start":2372500,"end":2385147,"speaker":"G","text":"Correct. Yeah, it goes, it goes back. It doesn't get paid to the contractor. So they had a contract of X amount of dollars, um, we finished under budget, and so that, that amount of dollars gets credited back from their contract."},{"start":2385147,"end":2391616,"speaker":"F","text":"Right, you get credit back to the contract, but there's funds available for the next phase. Yes. Yeah, correct. All right, thanks."},{"start":2394638,"end":2420395,"speaker":"A","text":"All right, so let's move to 5.2. Going through bond activity reports, and we start with 521, which is actually— oh, no, sorry. Yeah, 521, Measure S expenditure accounting for the period of July through end of September. Any questions on 521? No."},{"start":2424538,"end":2469412,"speaker":"C","text":"Yeah, I do. And on the, the 3rd page of that, there's a whole lot of expenditures for direct or district project support and payroll and all that. And the amounts aren't huge. But my question is, of course, since bond funds can't be used for administrative salaries, so what's the process or procedure for Approving, you know, about personnel salaries for— in an approved method, you know, on projects that meet the language of the bond."},{"start":2469412,"end":2481565,"speaker":"E","text":"The expenditures that include— that are included in the district project support in this report Are for bond director and bond accountant only."},{"start":2481565,"end":2494771,"speaker":"C","text":"Oh, okay. So there— so, um, are those positions— those, those positions are entirely devoted to, um, to managing bond issues? Correct. Oh, okay, good."},{"start":2494771,"end":2506818,"speaker":"A","text":"Just to clarify, there isn't a full-time bond director, right? So it's a portion of Martin basically that gets charged? 90%."},{"start":2507970,"end":2509353,"speaker":"E","text":"90% of bond director."},{"start":2509353,"end":2554084,"speaker":"A","text":"90% of Martin is a bond director and 10% is something else that doesn't get charged to the— okay, gotcha. Thank you. All right, any other questions on 521? Okay, moving on. Uh, 522 is easy because there were no change orders. 523, there were no no-bid contracts, and 524, there were no new projects, and 525, there was no new litigation or public disputes. I think I have that correct. Anybody have any questions about the, the lack of things?"},{"start":2554084,"end":2555256,"speaker":"C","text":"No."},{"start":2555256,"end":2593955,"speaker":"A","text":"Okay, great. Well, that takes us to 5.3 then, and this is Erica's portion of the agenda. And just to point out, you do have 5.3A through E, is it, that all refer to Fund 40, which we don't need to review and have no oversight of. Well, I mean, if anyone has any questions about it, since it was on the agenda, but the A, which is the summary, it does include a summary of Measure T, but the fund is completely exhausted, right?"},{"start":2597810,"end":2599228,"speaker":"E","text":"5.3.F, Measure S."},{"start":2599228,"end":2615709,"speaker":"A","text":"Right, we can skip ahead to 5.3. Okay, so let's skip ahead then to 5.3.F, which is— and there's an F and a revised F."},{"start":2615709,"end":2618282,"speaker":"E","text":"Yes, correct. Let's look at the revised one."},{"start":2618282,"end":2628586,"speaker":"A","text":"Revised one, that replaces the other one, is that correct? Okay. All right, so 5-3-F revised is the document we're on. Okay, go for it."},{"start":2628586,"end":2713748,"speaker":"E","text":"Okay, let's look at page 3 of the report. This is a Measure S bond summary. Page 3. Okay, so as of September 30th, 2026, Measure S has a total funding plan of approximately $308.5 million, including $90 million in Series A bond proceeds, $10.5 million in earned and budgeted interest, and $208 million in remaining bond authorization. Okay. To date, project expenditures total about $68.7 million, with an additional $7.5 million in outstanding contract commitments. The remaining budget for current projects is about $22 million, while about $210.5 million is identified for future projects, including the $35 million program contingency. Thank you. So we made the— according to your request, we made some changes to this report."},{"start":2713748,"end":2714727,"speaker":"A","text":"Yes, thank you."},{"start":2714727,"end":2716590,"speaker":"E","text":"Welcome. Please let me know."},{"start":2716590,"end":2735174,"speaker":"A","text":"So with the $90 million in bond sales plus the $10 million in interest, there's $100 million essentially in— a bunch of it spent, obviously. But what What— when does the next tranche need to be sold? When do we run out of the $100 million?"},{"start":2735174,"end":2739620,"speaker":"E","text":"I don't know that information yet."},{"start":2739620,"end":2740427,"speaker":"A","text":"Will that be—"},{"start":2740427,"end":2759435,"speaker":"G","text":"That'll— that, uh, Carl, that plan is for the second, probably the second half of next year. I know Rick's working and we're looking at bond markets and that kind of thing to try to figure out the right time that then makes the most sense for the taxpayers. But yeah, that'll That'll likely be the second half of next year."},{"start":2759435,"end":2771342,"speaker":"A","text":"So you're basically— you're saying that with the money that's on hand and your expected cost for the 2 schools you're going to do next summer, that lands under the $100 million?"},{"start":2771342,"end":2782047,"speaker":"G","text":"Yeah, that— and then, yep, exactly. And then potentially if we start new things after the master plan and that piece, everything could potentially crank up faster."},{"start":2782047,"end":2790754,"speaker":"A","text":"Because this says $98 million is budgeted essentially for current projects. So $98 million gets us through next summer's work."},{"start":2791397,"end":2791493,"speaker":"G","text":"Yep."},{"start":2791654,"end":2800115,"speaker":"A","text":"There's no need to raise additional money or sell additional bonds before— it's to fund next summer's work. Is that the intention?"},{"start":2800115,"end":2804922,"speaker":"G","text":"Yes, we have enough cash. We have enough cash to make that next summer work."},{"start":2804922,"end":2815049,"speaker":"A","text":"Okay, but anything initiated by the board between now and next summer, or anything that comes after that, essentially that's going to force another bond sale, right?"},{"start":2815687,"end":2824207,"speaker":"G","text":"Yep, that's rough. Yeah, roughly. You could probably do some of the pre-planning work and to make it really tight, but if, uh, but yes, that will force a new bond sale."},{"start":2824207,"end":2835247,"speaker":"F","text":"Yeah, I had a question on these bonds, the ones that have been— the $90 million. What, what, what's the average rate per foot, um, investors are buying it at?"},{"start":2835247,"end":2846735,"speaker":"G","text":"Um, I would have to go back and look at the sale documents. I don't remember off the top of my head, but I can put that as an action item and bring that back to your next, uh, to, to your next, uh, meeting."},{"start":2847217,"end":2866370,"speaker":"F","text":"Yeah, so it would be interesting to know, like, okay, let's just say hypothetically, um, and I doubt this would happen, this is personal opinion, but say if you actually issued $300 million of bonds, right? Like, what would the ultimate cost of those bonds be to the taxpayers?"},{"start":2866370,"end":2877455,"speaker":"G","text":"Yeah, we talked about this about a year, maybe a year and a half ago, and we, uh, it was part of a CBOC meeting. I could— we can pull that information back up and, and have that discussion again."},{"start":2878429,"end":2883762,"speaker":"F","text":"Yeah, and it's kind of tricky because obviously interest rates are going up, so the costs will go up, right?"},{"start":2883762,"end":2893828,"speaker":"G","text":"It depends on the bond market and when we sell the bonds too. It's— oh, totally. Yeah, so it's gonna— that all is gonna drive the discussion, but there are, uh, there are estimated costs."},{"start":2893828,"end":2905319,"speaker":"C","text":"And do you know, like, you know, the $300— this is probably another thing to look up— is of the $300 million, what proceeds, how much you're paying to the bond underwriter?"},{"start":2906901,"end":2917680,"speaker":"G","text":"Uh, yeah, that's, uh, I, again, I, I don't— didn't have that on, on the tip of my tongue because I wasn't— didn't know that. But I— that all is documented and we can bring that to the next meeting, no problem."},{"start":2917680,"end":2918468,"speaker":"F","text":"Yeah."},{"start":2918468,"end":2932669,"speaker":"G","text":"If you want to do— if it's the— if it's the committee's desire, we can bring like a little presentation on the finance side of the bond just to— I know we have a few new members. Carl knows it all, but the, the 3 of you, I'm not sure if you were here the last time we had that conversation."},{"start":2933185,"end":2936302,"speaker":"F","text":"Oh, that would be, uh, that'd be great. That would be, yeah, super helpful."},{"start":2936302,"end":2938449,"speaker":"G","text":"Awesome. No problem."},{"start":2938449,"end":2944280,"speaker":"F","text":"There's 2 CPAs sitting in the room here, so we have issues. Yep. All right, thank you."},{"start":2944280,"end":2970632,"speaker":"A","text":"Yeah, no problem. There, there's a presentation that was made to the board from the bond seller, essentially the, the facilitator of the bond sale. So getting a copy of that would be really helpful because it lays out Very clearly, like how much was sold, what the interest rate, how much it cost, all of that. So we can get you a link to that."},{"start":2970632,"end":2972471,"speaker":"C","text":"Good."},{"start":2972682,"end":2976920,"speaker":"G","text":"And we'll bring it to the next meeting too. And if you have any questions, we can answer them there."},{"start":2976920,"end":2985835,"speaker":"A","text":"I believe the interest rate was in around 4.5%, kind of is what I remember. I don't know if you remember, Mike, but I think it was somewhere in that range."},{"start":2986683,"end":2991145,"speaker":"C","text":"What do you know? The, do you know the approximate term of the bonds, the duration?"},{"start":2991145,"end":2992911,"speaker":"G","text":"Um,"},{"start":2994372,"end":2996234,"speaker":"A","text":"I wanted to say 40 years, but I,"},{"start":2996699,"end":2998256,"speaker":"G","text":"I believe they're 30. 30 years."},{"start":2998256,"end":2999268,"speaker":"A","text":"30, yeah."},{"start":2999268,"end":3005881,"speaker":"C","text":"So these, these bonds are paid back via the, via your property tax bill, right?"},{"start":3005881,"end":3006427,"speaker":"A","text":"Correct."},{"start":3006780,"end":3007567,"speaker":"G","text":"Property taxes, yes."},{"start":3007567,"end":3008193,"speaker":"C","text":"All right."},{"start":3008193,"end":3026225,"speaker":"A","text":"It was stated that at that interest rate in that term, someone said, and I can't remember who, that essentially it would cost the taxpayers double So it would be $180 million to— for the $90 million. Yeah, over the 30 years. I don't— haven't done the math myself, but yeah."},{"start":3026225,"end":3026245,"speaker":"C","text":"Yeah."},{"start":3033400,"end":3039568,"speaker":"A","text":"Okay, sorry, we were back, Erica, on page 3. Yes."},{"start":3039568,"end":3073284,"speaker":"E","text":"Let's scroll to page 5, and this report Provides an overview of Measure S funding allocations and project commitments. Measure S revenue and fund status. The total allocated budget is approximately $133 million, of which $76 million has been committed to project expenditures and contracts. The remaining uncommitted budget is about $57 million, which includes the $35 million Project contingency."},{"start":3074617,"end":3086659,"speaker":"A","text":"So just to be clear, that, that amount is the contingency plus what's going to be needed for the next summer's HVAC. That adds up to the $133 million or whatever that you're calling budgeted."},{"start":3086659,"end":3087494,"speaker":"E","text":"It's included."},{"start":3087494,"end":3095202,"speaker":"A","text":"But $35 million of that is contingency. Assuming that isn't used, it's going to be $100 million spent, essentially."},{"start":3095202,"end":3095619,"speaker":"E","text":"Yeah."},{"start":3095619,"end":3096117,"speaker":"A","text":"Okay."},{"start":3099242,"end":3100144,"speaker":"E","text":"No questions. I,"},{"start":3100369,"end":3136894,"speaker":"C","text":"you know, I'm thinking about that $35 million. I assume that's just basically a reserve. So on page 3, the summary there said it's plus $35 million. So the $35 million is for the entire Life of the, of the, of the bond, right? So it really makes sense to put the $35 million also in, um, what's been spent so far, which is only about, you know, a half or less."},{"start":3136894,"end":3140554,"speaker":"E","text":"It is for all the projects, as I understood."},{"start":3140554,"end":3166372,"speaker":"C","text":"Right. So, um, so on page 5, when the total revenue— the total budget is $100 and $130 million, $132 million. That includes all $35 million of the contingency, but this really only represents maybe half of the bond or less. So maybe the contingency ought to be prorated, you know, that's in there should be prorated."},{"start":3166372,"end":3203120,"speaker":"G","text":"Well, I think as we go through the bond measure, you'll spin down that contingency. We just haven't spent any of it on any of the contracts that have been— that have gone yet. So That contingency item will drop down as we— as projects go. But like I said, it has not been spent on any of that first $60, $70 million that we've already spent. It is— so yes, you're likely right. You can reduce that amount to prorate it against the amount that's left and have it have more money in projects."},{"start":3203120,"end":3203799,"speaker":"C","text":"Hmm."},{"start":3204757,"end":3230037,"speaker":"F","text":"So I, I would suggest we actually put a footnote and saying, you know, includes $30 million or that of contingency or whatever the number is that has not been spent. Because that way you're communicating that there's that contingency available and we shouldn't be planning to spend our entire contingency. That's, I think, your point."},{"start":3230037,"end":3230583,"speaker":"C","text":"Yeah, yeah."},{"start":3231276,"end":3231901,"speaker":"E","text":"Yeah, we'll do that."},{"start":3231901,"end":3232831,"speaker":"F","text":"Yeah, okay."},{"start":3234257,"end":3264618,"speaker":"G","text":"I do think, I mean, there's some best practices with bond programs, and we set that contingency aside to cover things like escalation and things like, uh, things like additional projects, uh, changes in needs from the district and that piece. I think when we get down to an implementation plan after the facilities master plan of what the rest of the bond looks like, that number is definitely going to shrink because it's, it's going to be proportionate to the dollars remaining. So But that's all. But I, I don't disagree with anything you said."},{"start":3264618,"end":3276418,"speaker":"F","text":"Yeah, I personally would be shocked if you did— if you got through this whole bond measure and spent any of the contingency. So I mean, things come up, to your point."},{"start":3277143,"end":3277384,"speaker":"G","text":"Yeah."},{"start":3277384,"end":3287532,"speaker":"E","text":"Okay, you have any questions?"},{"start":3288327,"end":3289114,"speaker":"A","text":"Nope, keep going."},{"start":3289114,"end":3320824,"speaker":"E","text":"Okay, let's go to page 6, the chart. Um, this chart provides an overview of the Measure S budget by project type. HVAC Phase 1 was completed under the budget with approximately $2.9 million in budget savings across 4 school sites, and the lighting retrofit program and classroom climate control projects I'm sorry,"},{"start":3320856,"end":3325212,"speaker":"C","text":"could you— which ones are totally expended? The lighting retrofit and something else?"},{"start":3325212,"end":3326895,"speaker":"E","text":"Classroom climate control."},{"start":3326895,"end":3327332,"speaker":"C","text":"Okay."},{"start":3327332,"end":3334621,"speaker":"E","text":"And the HVAC Phase 1 was completed and under the budget by about $2.9 million."},{"start":3334621,"end":3348274,"speaker":"G","text":"So what we'll do is, as we're doing the FMP and as we're doing the implementation plan, We will dump that $2.9 million back into the bucket of money available for projects."},{"start":3352530,"end":3352659,"speaker":"A","text":"Yep."},{"start":3352659,"end":3357649,"speaker":"C","text":"And Phase 2 is next summer, or that's Phase 3?"},{"start":3357649,"end":3391251,"speaker":"G","text":"No, Phase 2 is the one that we just finished this last summer, and we're going to be almost right on the dollar budget-wise there. Right now we're showing— right now the report shows us a little bit over. But we're anticipating a credit to cover the overage right now. We actually got it earlier this week, the credit from the contractor for their— for the savings on finishing that contract under budget that will cover all of that overage. So we're going to be almost right on the number for Phase 2."},{"start":3391251,"end":3397111,"speaker":"F","text":"Okay, and that was the 3 sites that have been mentioned earlier?"},{"start":3397111,"end":3399005,"speaker":"G","text":"That is correct."},{"start":3402007,"end":3411704,"speaker":"A","text":"So 4 sites were done in Phase 1. $3 million was saved. So the total cost was $19 million, roughly $18.5 million."},{"start":3412186,"end":3412523,"speaker":"G","text":"Is that right?"},{"start":3412523,"end":3425687,"speaker":"A","text":"Yeah, $19.5 million. $19.5 million. So you can see what my point here is, that to do 3 sites the next summer costs the same as 4 sites the previous summer, because it's going to come in at $19 million roughly and change, sounds like."},{"start":3426153,"end":3432734,"speaker":"G","text":"I think there's a, there's a little bit of rub there because the school sites are different sizes. But I mean, yeah."},{"start":3432734,"end":3437438,"speaker":"A","text":"I mean, fair enough. Every site is going to be different in complexity and number of classes."},{"start":3437438,"end":3478667,"speaker":"G","text":"Yeah, yeah. And the, the second site, we picked the first 4 sites in the first summer because they were the, the most straightforward from a building construction perspective, from a structural perspective, and from electrical upgrades. The Phase 2 sites actually had a pretty significant amount of electrical upgrades that ended up having to be done to support the new HVAC system. So that also drove a little bit of the cost there as well. So it's a— I don't disagree with you, Carl, that it's— I mean, the cost goes up every year, but making sure that it's apples to apples is kind of what I'm saying. Okay."},{"start":3479053,"end":3481318,"speaker":"A","text":"Yep, fair enough. Thank you."},{"start":3481318,"end":3528055,"speaker":"E","text":"Okay, if you have no questions regarding this, we go to page 7. This report provides a breakdown of Measure S project budgets and expenditures by school site. Several school sites have fully committed their allocated budgets, while others have remaining funds available. The largest remaining site budgets are at Henry Ford and Roy Cloud because of— these are HVAC Phase 3 projects. Any questions?"},{"start":3528055,"end":3564570,"speaker":"C","text":"Yeah, I did. So I think I know the answer to this. So Garfield, McKinley, and Northstar— well, I'm just looking at the total budget. They are an order of magnitude lower than all the other schools. Is that because they're the 3 that haven't been— that won't be done in the first 3 phases? Yes. So, so all these schools are in the, you know, $8, $9, $10, $11 million range, except for those 3 schools are less than $1 million or so."},{"start":3565310,"end":3566250,"speaker":"E","text":"Um, just the amount—"},{"start":3566250,"end":3567700,"speaker":"C","text":"does that mean they're to be done last?"},{"start":3567700,"end":3573930,"speaker":"E","text":"That's why I think— yes, I think the expenditures are less because they were not included in the—"},{"start":3573930,"end":3577030,"speaker":"A","text":"they haven't been scheduled yet for HVAC, but they will be."},{"start":3577030,"end":3579790,"speaker":"C","text":"But that would be like, say, Phase 4, presumably?"},{"start":3579790,"end":3608701,"speaker":"G","text":"That, that would be a phase that— yep, you're absolutely right. That would be a Phase 4. The money that's spent, those small dollars Are relatively small to the rest of the projects. Those are— that was for the temporary HVAC. This is everything that's been done at that campus by campus. So that's— that could include temporary HVAC measures, that could include some of the temporary cooling measures, that could include— that includes the lighting by site. So that's showing you every dollar, the dollar spent regardless of the project by site."},{"start":3608701,"end":3630835,"speaker":"A","text":"What's unique about KIPP? It doesn't— obviously it hasn't gotten HVAC, but it's the most expensive. Without HVAC. So is it particularly large and needed a lot of lighting or needed a lot of portable cooling? Why, why is it $1.2 million and Northstar is $600K, half the price basically for the same upgrades?"},{"start":3630835,"end":3636526,"speaker":"F","text":"Classrooms, the number of classrooms at the site."},{"start":3636526,"end":3645855,"speaker":"A","text":"So it has more classrooms than Garfield. Pause. All these other schools that are—"},{"start":3647114,"end":3652346,"speaker":"C","text":"yeah. Where's, where's KIPP? KIPP is the old Fair Oaks campus. Oh."},{"start":3652346,"end":3656511,"speaker":"E","text":"Yes, the whole amount is for Lightning retrofit expense."},{"start":3656511,"end":3659657,"speaker":"A","text":"Doesn't even include portable cooling, you're saying?"},{"start":3659657,"end":3665168,"speaker":"E","text":"It's $1.1 million for the Lightning retrofit. I'm checking the PO right now."},{"start":3665168,"end":3673530,"speaker":"A","text":"Okay, just because it has a lot more classrooms than any other campus? Not every campus, but, but the ones that we can tell here."},{"start":3674381,"end":3674558,"speaker":"G","text":"Yeah."},{"start":3674719,"end":3676629,"speaker":"A","text":"Okay. All right."},{"start":3676629,"end":3688478,"speaker":"C","text":"And so the largest single number in here is near the bottom, construction/bond of $45 million. What is that if it's not going toward one of these schools?"},{"start":3688478,"end":3694290,"speaker":"G","text":"That includes, that includes your $35 million contingency. I'm sorry, Erica, I didn't mean to talk over"},{"start":3694371,"end":3694467,"speaker":"E","text":"you."},{"start":3695173,"end":3700055,"speaker":"G","text":"But that, that, that, that's got your, that's got your, uh, your $35 million contingency."},{"start":3700055,"end":3700873,"speaker":"F","text":"Okay."},{"start":3701676,"end":3706028,"speaker":"A","text":"And it also has the $2.4 million a year for Van Pelt. Okay."},{"start":3706092,"end":3716786,"speaker":"G","text":"Yes. And, uh, and attorneys' fees and district staff, uh, payments to district staff. And, um, there's several other things that go in that category."},{"start":3716786,"end":3719884,"speaker":"E","text":"General management and common costs. Okay. Are included in this."},{"start":3720714,"end":3723256,"speaker":"A","text":"So what's in the district-wide category below it then?"},{"start":3723256,"end":3733072,"speaker":"G","text":"Pulling it up. Hold on one second."},{"start":3733072,"end":3740800,"speaker":"E","text":"I think those are the temporary HVAC Phase 1 units."},{"start":3740800,"end":3749448,"speaker":"G","text":"Correct. That is, that is correct. That is your— that is the district-wide Temporary HVAC and cooling measures."},{"start":3749448,"end":3757199,"speaker":"A","text":"Okay, is there a reason they weren't allocated to the sites like the other improvements?"},{"start":3757199,"end":3779120,"speaker":"G","text":"We did a bulk purchase of all those HVAC units, those temp HVAC units, and at the time we— and we're returning some of them and we're getting— and we're going to be selling them back. And so it was a little bit more straightforward. to do that than to inventory each one and break it down by site, but it's doable. We can go back and pull that."},{"start":3779120,"end":3781548,"speaker":"A","text":"Nice. I was just curious. Thank you."},{"start":3781548,"end":3782618,"speaker":"G","text":"No problem."},{"start":3782618,"end":3785843,"speaker":"A","text":"All right, Erika."},{"start":3785843,"end":3787286,"speaker":"E","text":"Let's go to page 9."},{"start":3787286,"end":3788113,"speaker":"A","text":"Okay."},{"start":3788113,"end":3836317,"speaker":"E","text":"This report is the overall project summary report, provides a detailed breakdown of the Measure S original budget, budget changes, expenditures and outstanding commitments by individual project as of September 30th, 2026. As mentioned earlier, HVAC Phase 1 has been completed with about $2.9 million in budget savings. And the remaining budget also includes the $35 million in program contingency and the funding for, for the HVAC Phase 2 and 3. Thank you. Please let me know if you have any questions."},{"start":3836317,"end":3851319,"speaker":"A","text":"Not for me. Thank you."},{"start":3856431,"end":3900739,"speaker":"E","text":"Okay, if there are no questions, page 12. Let's go to page 12. It's— this is the Measure S encumbrance summary by project and vendor report. It is a quarterly vendor-level expenditure detail report covering July 1st through September 30th expenditures. These are actuals. Total expenditures for the quarter were about $8.66 million, primarily for HVAC Phase 2 and Phase 3 projects. So you can see these are vendor-specific expenditures."},{"start":3906572,"end":3915492,"speaker":"A","text":"What was the— there was from Phase 1 in this period, there was $8,000 in QKA architecture fees for Phase 1."},{"start":3915492,"end":3930115,"speaker":"G","text":"We hold a small amount of money of QKA's, or any architect, I should say, any architect's contract until we get DSA closeout to make sure that they follow through with their commitment to get the DSA closeout."},{"start":3930870,"end":3932133,"speaker":"A","text":"Okay, got it."},{"start":3932133,"end":3936620,"speaker":"G","text":"So, and that usually happens months and months after the project's completed. So."},{"start":3936620,"end":3938945,"speaker":"A","text":"Okay, thank you."},{"start":3938945,"end":3980086,"speaker":"E","text":"Okay, if you— no more questions, we can go to page 18. And this is an expenditure report. Also, it's a quarterly report for July 1st through September 30th. It is an expenditure— expenditures summary by categories. Please let me know if you have any questions. Okay."},{"start":4001436,"end":4002069,"speaker":"A","text":"Nope. That's it."},{"start":4002069,"end":4002345,"speaker":"E","text":"That's it."},{"start":4002345,"end":4103266,"speaker":"A","text":"All right. Thank you very much. Any Wrap-up questions on the Measure S reports? Alrighty. Thank you, Erica, as always. Okay, so that wraps up 5.3 and takes us to 5.4, future meeting dates, agenda topics for the next meeting. I do want to make a pitch for site visits, so I'll mention that in this section. So we could pick a date for our next meeting and any topics. So we had one topic already suggested, which is the bond sale recap, right? Yeah. For the first tranche. So we'll put that on the agenda for the next meeting. The— Rick knows about this. So one of the duties of the committee is to inspect projects. We now have HVAC Phase 2 completed at 3 schools. And if any of the committee members are interested, we could organize, with Martin's assistance, site visits to see 1, 2, or 3 of those projects and see what the work was done. Okay. That the work that was done. And yeah, so I'll just put it out there if anyone's interested. We can, we can work with Martin on scheduling."},{"start":4103266,"end":4105580,"speaker":"H","text":"I would love to go visit."},{"start":4105580,"end":4111639,"speaker":"A","text":"Okay, so there's one enthusiastic hand raiser. Yes, Rick, you want to go again?"},{"start":4111639,"end":4112010,"speaker":"G","text":"Sure."},{"start":4112897,"end":4115864,"speaker":"F","text":"Take a tour. I think I'll just help. Sure."},{"start":4117238,"end":4143738,"speaker":"A","text":"Yes, you can see a lot of closets with HVAC units in them. It's— but it's good to see the school sites, and if you haven't been in a while, it's— okay, so I'll work with Martin and we will get something scheduled. Do you feel like you want to visit all 3? Is one enough? What's the temperament of the committee members?"},{"start":4143738,"end":4148357,"speaker":"F","text":"One's probably enough for me. Yeah, I think so. One."},{"start":4148357,"end":4149254,"speaker":"A","text":"Okay."},{"start":4149254,"end":4152893,"speaker":"D","text":"I could go from 1 to 2."},{"start":4152893,"end":4171521,"speaker":"A","text":"Okay. Well, what we did is for the last time that we did this, as Rick will recall, we had lighting and HVAC to look at. We scheduled each site on a different day, and the members who could make that particular day saw that site. And if you couldn't, you didn't. So we can do the same thing again."},{"start":4171521,"end":4181791,"speaker":"D","text":"It'd be nice to be able to see one of the schools that required the electrical upgrade as Well, I don't remember which one that was. Kennedy. Okay. There's a Heisman Trophy sitting there waiting"},{"start":4182866,"end":4183027,"speaker":"G","text":"for us."},{"start":4183027,"end":4197173,"speaker":"A","text":"All right. So we will, we'll put Kennedy at the top of the list and pick a time. Generally, I think we did afternoons after school was out. So that's, if that's a convenient time, we'll throw some dates out there."},{"start":4197173,"end":4199051,"speaker":"D","text":"Yes, that sounds fantastic."},{"start":4199148,"end":4199276,"speaker":"A","text":"Okay."},{"start":4199373,"end":4200095,"speaker":"D","text":"Thanks, Mark, for doing that."},{"start":4201883,"end":4206444,"speaker":"A","text":"Anything else for the next meeting that someone would like to add to the agenda?"},{"start":4206444,"end":4247917,"speaker":"D","text":"No. You know, I guess one of the things when I was going over, I believe it was handout 52.1, some of the expenditures and the credits I, I guess got a little hard for me to follow, and I believe that may have been the total. Was that part of the refund for that they were— he was discussing leading up to $3.8 million, $3.2 million? And which—"},{"start":4247917,"end":4252989,"speaker":"G","text":"No, no, these are $5.2 million are expenditures."},{"start":4255138,"end":4258951,"speaker":"D","text":"Oh, that's not Fund 40 anyway. That's fine. Forget it."},{"start":4258951,"end":4269916,"speaker":"E","text":"If you see any negative in Measure S report, that means those are prior year adjustments related to accrued expenditures."},{"start":4269916,"end":4273470,"speaker":"D","text":"Thank you. Never mind."},{"start":4275589,"end":4307935,"speaker":"A","text":"One of the items that is— I'm recalling this from earlier this calendar year. I believe this is the meet— the next meeting would be covering the October 1st through December 31st period. So we would be shooting for January timeframe to meet next. We did delay that meeting, equivalent meeting this year, because we wanted to have the bond audit reports available to review, and I think they were scheduled in early Feb. Do you have a schedule for the bond audit reports?"},{"start":4307935,"end":4312242,"speaker":"E","text":"Yeah. No, I don't"},{"start":4312420,"end":4322081,"speaker":"A","text":"have— Okay. I remember Rick answered this question a year ago at this time and said, oh, we'll have them on February 1st. So let's do the meeting in mid-February, and that way the bond auditors can come and present."},{"start":4322081,"end":4323273,"speaker":"E","text":"They're auditing right now."},{"start":4323273,"end":4323870,"speaker":"A","text":"Yes."},{"start":4323870,"end":4325948,"speaker":"E","text":"Until January, but I don't know when."},{"start":4325948,"end":4328254,"speaker":"A","text":"But you don't know when the reports are going to be produced."},{"start":4328254,"end":4331064,"speaker":"F","text":"That's the audit for the previous fiscal year."},{"start":4331064,"end":4392184,"speaker":"A","text":"And the importance of that is that The bond audit is done. It's presented to the board and to the CBOC, and then that becomes part of the annual report that we author. So if we don't catch that at the next meeting, then we don't see the bond audit reports until the June meeting. Is it the June meeting? Anyway, it delays 3 months essentially getting the annual report out. So we can either Pick a date. So I guess what I would recommend is let's pick a tentative date now in January that you can all make. And if we find out that, hey, by delaying it 3 weeks, we can have the bond audit reports, we can pick a new date. How does that sound? Okay. So grab your calendars. I don't know, Olivia, if you already have a date in mind, or if you look at the calendar and can propose Something for January?"},{"start":4392184,"end":4401675,"speaker":"B","text":"About the last week of January?"},{"start":4401675,"end":4403913,"speaker":"F","text":"Yeah, uh, how about the 27th of January?"},{"start":4403913,"end":4409364,"speaker":"B","text":"So if you want to pick the 28th, that's Thursday."},{"start":4409364,"end":4419969,"speaker":"F","text":"Uh, the 28th, I can't make it. I can do the 27th. We all see that on Thursday, right?"},{"start":4419969,"end":4421984,"speaker":"D","text":"The 28th sounds good."},{"start":4423682,"end":4424636,"speaker":"F","text":"The 28th, I have—"},{"start":4424636,"end":4439613,"speaker":"A","text":"he can't do the 28th, but so the proposal is the 27th, or we could do the previous week, which would be the— if you have enough time to close the books and get the report done, Erica, could be the 20th or 21st unless there's a board meeting. Okay,"},{"start":4440526,"end":4444358,"speaker":"C","text":"there's a 21st Is that a Thursday? Yeah, yeah, I have a conflict on that."},{"start":4444843,"end":4449711,"speaker":"A","text":"Okay, how about the 27th? Are we generally available the 27th?"},{"start":4449711,"end":4472624,"speaker":"C","text":"Yes. Um, well, what about, um, February 4th? It seems like it would be better to, you know, to always have it on the same day of the week, kind of like city council, school board, so we're all on the same schedule. Yeah, I'd do the 14th. The 3rd will not work."},{"start":4472624,"end":4478345,"speaker":"D","text":"Would we know by the 14th of January how the audit is looking?"},{"start":4478345,"end":4483186,"speaker":"A","text":"I think we would know by early Jan— the first week of Jan."},{"start":4487037,"end":4488268,"speaker":"D","text":"How are you looking on the 14th?"},{"start":4488268,"end":4490330,"speaker":"C","text":"January 14th?"},{"start":4490847,"end":4491251,"speaker":"D","text":"Yeah."},{"start":4492366,"end":4493158,"speaker":"C","text":"Oh, I'd do it."},{"start":4495531,"end":4499365,"speaker":"D","text":"Because it's, it's sounding a little slightly on the tentative side."},{"start":4499365,"end":4502815,"speaker":"C","text":"Yeah, I could do the 14th."},{"start":4502815,"end":4505702,"speaker":"A","text":"Do you have enough time to make the 14th?"},{"start":4505702,"end":4508510,"speaker":"C","text":"I don't think it's done by then."},{"start":4508510,"end":4523509,"speaker":"A","text":"Not the audit report, but the, the period reports. That, that, that would work, right? If— but if the audit report comes and they say it's going to be February 28th, then we'll go ahead with this meeting and catch it at the next one."},{"start":4524352,"end":4524578,"speaker":"C","text":"Right."},{"start":4524659,"end":4527754,"speaker":"A","text":"Okay. So January 14th is the current proposal."},{"start":4527754,"end":4539300,"speaker":"C","text":"Give you enough time to close the quarter— close for a quarter. 14th. Okay."},{"start":4539446,"end":4564300,"speaker":"A","text":"Yes, yes, yes, yes. Okay. Tentatively 1/14th, and with, uh, the possibility of shifting given the timing of the bond audit reports. The next meeting then would presumably be in the April timeframe because we'd be closing out the January, February, March period. So we'll just see what the timing of the audit reports is, and then we'll pick accordingly."},{"start":4564300,"end":4566448,"speaker":"H","text":"Great."},{"start":4566448,"end":4617635,"speaker":"A","text":"I think the challenge was this year, back at this time period, the audit date kept slipping, and so we had to keep moving the CBOC meeting. It was, it was not great. So it may be best to just go ahead with the 14th. Get the meeting done and schedule the next one when their reports— okay. All right, so we have a proposed date, we have topics, we have a follow-up for site visits. Is there anything else to be discussed before we move to adjournment? Oh, uh, There was one thing. The district has aggressively sought out new members of the committee. I think it's aggressive. I got an email and a text message about it. So have there been applications? Do you know?"},{"start":4617635,"end":4620725,"speaker":"E","text":"Yeah, 5."},{"start":4620725,"end":4680944,"speaker":"A","text":"5 applications so far. All right, fantastic. And what's the process for reviewing and approving them? Yeah. Okay. So we could have as many as 5, maybe even more, who knows, new members to strengthen the ranks here because we are below the statutory requirement. Some positions are required and not filled. So that's great to hear. Thank you to our new superintendent for the aggressive marketing of this and I was surprised to see it. I'm surprised and delighted to see that it came out in under the title of governance, and this seems to be a new thing, Mike. I'm seeing like every board meeting is followed by a wrap-up that goes out to the community. It's like a new level of transparency. I don't know if that's intentional or—"},{"start":4680944,"end":4710103,"speaker":"H","text":"Yes, we're working on our communications plan. The district is working on our communications plan. You'll see some changes there. There's community meetings coming up. Community open houses. There's actually— all of you are invited to our community open houses. Email me and I can tell you when the next one is. It's at 3 schools on any given day. Come in and see it. Um, and, uh, Jorge, our director, Jorge Quintana, our director of communications, just gave a great presentation on the state of district present, uh, communications. Naomi would love it. Um, uh, at the last board meeting."},{"start":4710103,"end":4713343,"speaker":"C","text":"Yeah. I can tell her if you want to know."},{"start":4713343,"end":4718996,"speaker":"A","text":"All right, uh, then does someone want to move to adjourn?"},{"start":4718996,"end":4721173,"speaker":"D","text":"Move to adjourn."},{"start":4721173,"end":4728867,"speaker":"A","text":"Second. All in favor? Aye. Okay, the meeting is adjourned. Thank you, everyone. See you in January."}]}