  "_metadata": {
    "description": "RCSD Citizens' Bond Oversight Committee (CBOC) for Measures S and T. Curated metadata + documents from the district's authoritative committee page; meetings[] recordings + transcript status are populated by scripts/build-committees.mjs from the committee-tagged YouTube index and AssemblyAI transcript cache.",
    "source": "Authoritative: https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee (members, annual reports, agendas, handouts, minutes, bylaws). Recordings from the RCSD YouTube channel.",
    "lastUpdated": "2026-05-30"
  },
  "id": "cboc",
  "type": "cboc",
  "scope": "district",
  "school": null,
  "nameEn": "Citizens' Bond Oversight Committee",
  "nameEs": "Comité Ciudadano de Supervisión de Bonos",
  "shortName": "CBOC",
  "descriptionEn": "California Education Code requires a Citizens' Bond Oversight Committee to review and report to the public on the use of school bond proceeds. RCSD's committee oversees the voter-approved Measure S and Measure T general obligation bonds, reviewing expenditures and audits to confirm the money is spent only on authorized school facilities projects. The committee meets quarterly (typically August, November, February, and May) at the District Office.",
  "descriptionEs": "El Código de Educación de California exige un Comité Ciudadano de Supervisión de Bonos que revise e informe al público sobre el uso del dinero de los bonos escolares. El comité de RCSD supervisa los bonos de obligación general aprobados por los votantes (las Medidas S y T), revisando los gastos y las auditorías para confirmar que el dinero se use solo en proyectos autorizados de instalaciones escolares. El comité se reúne cada trimestre (por lo general en agosto, noviembre, febrero y mayo) en la Oficina del Distrito.",
  "homepage": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee",
  "applyUrl": "https://forms.gle/PNjb1FhwsW5KExxMA",
  "bylawsUrl": "https://data.rcsd.info/documents/committees/cboc/cboc-bylaws-approved-2023-05-11.pdf",
  "bylawsApproved": "2023-05-11",
  "email": null,
  "chair": null,
  "members": [
    {
      "name": "Jennifer Givens",
      "role": "Parent/Guardian, District",
      "termExpires": "2027-06-30"
    },
    {
      "name": "Anthony Hanni",
      "role": "Member at Large",
      "termExpires": "2028-06-30"
    },
    {
      "name": "Alan Hansen",
      "role": "Taxpayer Organization",
      "termExpires": "2027-06-30"
    },
    {
      "name": "Rick Hunter",
      "role": "Member at Large",
      "termExpires": "2027-06-30"
    },
    {
      "name": "Carl Landers",
      "role": "Parent/Guardian, District/PTA",
      "termExpires": "2027-06-30"
    },
    {
      "name": "Jitpal Sahai",
      "role": "Parent/Guardian, District",
      "termExpires": "2027-06-30"
    }
  ],
  "vacancies": [
    "Business Organization",
    "Senior Citizen Organization"
  ],
  "annualReports": [
    {
      "year": "2023-24",
      "measure": "S",
      "url": "https://drive.google.com/file/d/12r2SlhiZnv798q-xBo2zy7lW5iTZxHZ3/view"
    },
    {
      "year": "2023-24",
      "measure": "T",
      "url": "https://drive.google.com/file/d/1RnI2MGo8GwBvwtH0iR0pAlP__wpzEO22/view"
    },
    {
      "year": "2022-23",
      "measure": "S",
      "url": "https://drive.google.com/file/d/1myIMn4azMdUcqNPRYRxg8TIbYMY9ud9a/view"
    },
    {
      "year": "2022-23",
      "measure": "T",
      "url": "https://drive.google.com/file/d/1YehNLmKmjWZg9ilH86sH1pO6vtt6bOmt/view"
    },
    {
      "year": "2021-22",
      "measure": "T",
      "url": "https://drive.google.com/file/d/1RlgYnNhRS7-LecFku70RMy0qlhonBRWd/view"
    },
    {
      "year": "2020-21",
      "measure": "T",
      "url": "https://drive.google.com/file/d/12kSj3p4nlvAS1tVfufr_PtZWjpCkcTFJ/view"
    },
    {
      "year": "2019-20",
      "measure": "T",
      "url": "https://drive.google.com/file/d/1b9FmR6tC_7dFakjJkR2GpyPzLlo7T5pI/view"
    },
    {
      "year": "2018-19",
      "measure": "T",
      "url": "https://drive.google.com/file/d/1mO-erD5ZCXHSJjSD3IeIOQz11CjomNPg/view"
    },
    {
      "year": "2017-18",
      "measure": "T",
      "url": "https://drive.google.com/file/d/1h68rRLpxYRhBrpWChFbXGAeCCk4ozPkz/view"
    },
    {
      "year": "2016-17",
      "measure": "T",
      "url": "https://drive.google.com/file/d/1aToEsISKzTV1YdkOT0jU3t0-RJC7c81F/view"
    },
    {
      "year": "2015-16",
      "measure": "T",
      "url": "https://drive.google.com/file/d/145W0WddRIxD-rRDISbP0hq6q-4B4ALop/view"
    }
  ],
  "videoTitleMatch": [
    "Bond Oversight"
  ],
  "meetings": [
    {
      "date": "2026-06-11",
      "time": "18:00",
      "location": "District Office",
      "youtube": null,
      "agendaUrl": null,
      "handoutsUrl": null,
      "minutesUrl": null,
      "descriptionEn": "Regular quarterly CBOC meeting.",
      "descriptionEs": "Reunión trimestral regular del CBOC.",
      "status": "scheduled"
    },
    {
      "date": "2026-04-30",
      "youtube": "PnOi-XcblAE",
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/april-30-2026-agenda-and-handouts",
      "handoutsUrl": null,
      "minutesUrl": null,
      "title": "April 30, 2026--Citizens' Bond Oversight Committee Meeting",
      "status": "past",
      "transcriptKey": "cboc-2026-04-30",
      "hasTranscript": true,
      "duration": "1h 41m",
      "durationSeconds": 6105,
      "summaryEn": "CBOC reviewed clean audit reports for Measure S and Measure T for fiscal year 2024-25 with no findings on allowability or compliance. Committee approved the annual report process for 2024-25, discussed HVAC modernization Phase 1 completing under budget (~$22M vs. $25M approved), and heard Phase 2 GMP approved for summer 2026 construction at Kennedy and Orion.",
      "summaryEs": "El CBOC revisó reportes de auditoría limpios para Measure S y Measure T para el año fiscal 2024-25 sin hallazgos sobre permitibilidad o cumplimiento. El comité aprobó el proceso del reporte anual para 2024-25, discutió la Fase 1 de modernización de HVAC completándose bajo presupuesto (~$22M vs. $25M aprobados), y escuchó que el GMP de la Fase 2 fue aprobado para construcción en verano 2026 en Kennedy y Orion.",
      "summaryGeneratedAt": "2026-05-31"
    },
    {
      "date": "2025-11-05",
      "youtube": "7LxtZHhcALg",
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/november-5-2025-agenda-and-handouts",
      "handoutsUrl": null,
      "minutesUrl": "https://drive.google.com/file/d/1EvaLAkp4mW1hnSqQ4Oskb1JVf0hBsp7A/view",
      "title": "November 5, 2025--Citizens' Bond Oversight Committee Meeting",
      "status": "past",
      "transcriptKey": "cboc-2025-11-05",
      "hasTranscript": true,
      "duration": "2h 29m",
      "durationSeconds": 8987,
      "summaryEn": "CBOC approved the 2023-24 Measure S and T annual reports after corrections clarified accounting discrepancies. The committee discussed the Measure S $298 million implementation plan, with three prioritization scenarios presented to the board for January decision-making. Significant debate centered on the $17 million LED lighting retrofit project's sequencing, with concern that $1 million per campus is being spent on buildings that may be demolished under the Master Plan.",
      "summaryEs": "El CBOC aprobó los reportes anuales de 2023-24 de Measure S y Measure T después de correcciones que aclararon discrepancias contables. El comité discutió el plan de implementación de Measure S de $298 millones, con tres escenarios de priorización presentados a la junta para decisión en enero. Hubo debate significativo sobre la secuencia del proyecto de retrofit de iluminación LED de $17 millones, con preocupación de que se gasten $1 millón por campus en edificios que podrían ser demolidos según el Plan Maestro.",
      "summaryGeneratedAt": "2026-05-31"
    },
    {
      "date": "2025-08-06",
      "youtube": "8Zvv208Qsu0",
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/august-6-2025-agenda-and-handouts",
      "handoutsUrl": null,
      "minutesUrl": "https://drive.google.com/file/d/1q_BMSD6EycA5XFL5ZhICgyIDHRxIKgca/view",
      "title": "August 6, 2025--Citizens' Bond Oversight Committee Meeting",
      "status": "past",
      "transcriptKey": "cboc-2025-08-06",
      "hasTranscript": true,
      "duration": "2h 28m",
      "durationSeconds": 8899,
      "summaryEn": "The CBOC discussed the FY 2023–24 annual reports for Measures T and S but deferred approval pending corrected auditor's reports; numerical discrepancies in fund balance and revenue figures for Measure T must be reconciled. The committee also received updates on Measure S HVAC upgrades at four schools (Selby, Hoover, Roosevelt, Taft) nearing completion, LED lighting retrofits progressing ahead of schedule, and Measure T solar projects on track to meet the PG&E NEM 2 deadline by April 2026.",
      "summaryEs": "El CBOC discutió los reportes anuales de años fiscales 2023–24 para las Medidas T y S pero posposó la aprobación pendiente reportes de auditoría corregidos; se deben reconciliar discrepancias numéricas en el balance de fondos y cifras de ingresos para la Medida T. El comité también recibió actualizaciones sobre las mejoras de HVAC de la Medida S en cuatro escuelas (Selby, Hoover, Roosevelt, Taft) próximas a completarse, retroadecuaciones de iluminación LED progresando adelante del cronograma, y proyectos solares de la Medida T en camino de cumplir el plazo de la fecha límite de NEM 2 de PG&E para abril de 2026.",
      "summaryGeneratedAt": "2026-05-31"
    },
    {
      "date": "2025-05-07",
      "youtube": "nnEA6RTn_OU",
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/may-7-2025-agenda-and-handouts",
      "handoutsUrl": null,
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/may-7-2025-minutes",
      "title": "May 7, 2025--Citizens' Bond Oversight Committee Meeting",
      "status": "past",
      "transcriptKey": "cboc-2025-05-07",
      "hasTranscript": true,
      "duration": "1h 48m",
      "durationSeconds": 6521,
      "summaryEn": "The committee discussed Measure S progress including a facilities master plan update (board approval expected May 28), HVAC upgrades at four schools (~$5M each, construction summer 2025), and a $17M district-wide LED lighting retrofit underway. Financial reports showed $3M in Measure S expenditures through March 2025, with annual bond oversight reports due for approval at the next meeting.",
      "summaryEs": "El comité discutió el progreso de Measure S, incluyendo una actualización del plan maestro de instalaciones (aprobación de la junta prevista para el 28 de mayo), mejoras de HVAC en cuatro escuelas (~$5M cada una, construcción verano 2025), y un proyecto de retrofit de iluminación LED en todo el distrito de $17M en marcha. Los reportes financieros mostraron $3M en gastos de Measure S hasta marzo de 2025, con reportes anuales de supervisión de bonos pendientes de aprobación en la próxima reunión.",
      "summaryGeneratedAt": "2026-05-31"
    },
    {
      "date": "2025-02-25",
      "youtube": "AUh3FIhQDy8",
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/february-25-2025-agenda-and-handouts",
      "handoutsUrl": null,
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/february-25-2025-minutes",
      "title": "February 25, 2025--Citizens' Bond Oversight Committee Meeting",
      "status": "past",
      "transcriptKey": "cboc-2025-02-25",
      "hasTranscript": true,
      "duration": "1h 8m",
      "durationSeconds": 4088,
      "summaryEn": "CBOC reviewed clean audit opinions for Measure S and T (2023-24 fiscal year). District detailed HVAC upgrades at four schools ($19M construction, ~$2M architectural fees) launching June-August 2025, plus $17M lighting retrofit and $14M solar project. Bond expenditures through December 31, 2024 total $213.6M; roughly $80M earmarked for current projects.",
      "summaryEs": "El CBOC revisó opiniones de auditoría limpias para Measure S y T (año fiscal 2023-24). El distrito detalló mejoras de HVAC en cuatro escuelas ($19M construcción, ~$2M honorarios arquitectónicos) lanzándose junio-agosto de 2025, más retrofit de iluminación de $17M y proyecto solar de $14M. Los gastos del bono hasta el 31 de diciembre de 2024 totalizan $213.6M; aproximadamente $80M designados para proyectos actuales.",
      "summaryGeneratedAt": "2026-05-31"
    },
    {
      "date": "2025-01-22",
      "youtube": "Jvh94J4I3Bs",
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/january-22-2025-agenda-and-handouts",
      "handoutsUrl": null,
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/january-22-2025-minutes",
      "title": "January 22, 2025--Citizens' Bond Oversight Committee Meeting",
      "status": "past",
      "transcriptKey": "cboc-2025-01-22",
      "hasTranscript": true,
      "duration": "2h 35m",
      "durationSeconds": 9312,
      "summaryEn": "CBOC reviewed Measure S and T bond spending through September 30, 2024. Key discussion centered on a $16.9 million LED lighting retrofit project approved by the board in November, raising questions about whether it qualifies as a sole-source contract under Government Code 4217 and whether competitive bidding could reduce costs. The committee also approved a $540,000 energy consultant contract with Sage. An ad hoc subcommittee was formed to review the lighting retrofit analysis before the next meeting.",
      "summaryEs": "El CBOC revisó el gasto de bonos Measure S y T hasta el 30 de septiembre de 2024. La discusión clave se centró en un proyecto de retrofit de iluminación LED de $16.9 millones aprobado por la junta en noviembre, que planteó preguntas sobre si califica como contrato de única fuente bajo el Código del Gobierno 4217 y si la licitación competitiva podría reducir costos. El comité también aprobó un contrato de consultor energético de $540,000 con Sage. Se formó un subcomité ad hoc para revisar el análisis del retrofit de iluminación antes de la próxima reunión.",
      "summaryGeneratedAt": "2026-05-31"
    },
    {
      "date": "2024-08-29",
      "youtube": "kDqgjt56aXc",
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/august-29-2024-agenda-and-handouts",
      "handoutsUrl": null,
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/august-29-2024-minutes",
      "title": "August 29, 2024--Citizens' Bond Oversight Committee Meeting",
      "status": "past",
      "transcriptKey": "cboc-2024-08-29",
      "hasTranscript": true,
      "duration": "2h 1m",
      "durationSeconds": 7315,
      "summaryEn": "CBOC approved Measure T and Measure S annual reports for fiscal 2022–23 after correcting bond financial summaries and adding contract counts to no-bid and change-order tables. The committee also heard district counsel explain why independent legal counsel is not required by statute, and received updates on Measure S facilities master plan progress and Measure T project closeouts.",
      "summaryEs": "CBOC aprobó los reportes anuales de Measure T y Measure S para el año fiscal 2022-23 después de corregir resúmenes financieros de bonos y agregar conteos de contratos a tablas de contratos sin ofertas y cambios. El comité también escuchó al abogado del distrito explicar por qué la ley no requiere un abogado independiente, y recibió actualizaciones sobre el progreso del plan maestro de instalaciones de Measure S y cierres de proyectos de Measure T.",
      "summaryGeneratedAt": "2026-05-31"
    },
    {
      "date": "2024-06-18",
      "youtube": "cY66uY9Z-MY",
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/june-17-2024-agenda-and-handouts",
      "handoutsUrl": null,
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/june-17-2024-minutes",
      "note": "District page lists this meeting as June 17, 2024; the recording is titled June 18, 2024.",
      "title": "June 18, 2024--Citizens' Bond Oversight Committee Meeting",
      "status": "past",
      "transcriptKey": "cboc-2024-06-18",
      "hasTranscript": true,
      "duration": "1h 31m",
      "durationSeconds": 5496,
      "summaryEn": "The CBOC reviewed fiscal year 2023 financial audits for Measure T and S, finding no deficiencies or non-compliance issues. The committee also received updates on Measure S progress, including energy efficiency reviews, HVAC upgrade procurement with six pre-qualified architects, and launch of the Master Facilities Plan (cost ~$400K, delivery January-February 2025). Measure T closeout continues with solar Phase 2 project (15 contractors responding) targeting April 2026 completion.",
      "summaryEs": "El CBOC revisó auditorías financieras del año fiscal 2023 para Measure T y S, sin encontrar deficiencias ni problemas de cumplimiento. El comité también recibió actualizaciones sobre el progreso de Measure S, incluyendo revisiones de eficiencia energética, compra de mejoras HVAC con seis arquitectos pre-calificados, e inicio del Plan Maestro de Instalaciones (costo ~$400K, entrega enero-febrero 2025). El cierre de Measure T continúa con proyecto solar Fase 2 (15 contratistas interesados) con vencimiento en abril 2026.",
      "summaryGeneratedAt": "2026-05-31"
    },
    {
      "date": "2024-03-21",
      "youtube": "icioqpwTI18",
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/march-21-2024-agenda-and-handouts",
      "handoutsUrl": null,
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/march-21-2024-minutes",
      "title": "March 21, 2024--Citizens' Bond Oversight Committee Meeting",
      "status": "past",
      "transcriptKey": "cboc-2024-03-21",
      "hasTranscript": true,
      "duration": "2h 27m",
      "durationSeconds": 8848,
      "summaryEn": "The committee reviewed Van Pelt Construction Services' selection as Measure S bond program manager through a competitive RFP process, heard their management approach emphasizing community engagement and financial stewardship, and received the first Measure S financial report showing $90 million in Series A bonds sold June 2023 with $728,770 in interest revenue through December and minimal expenditures to date as planning phases begin.",
      "summaryEs": "El comité revisó la selección de Van Pelt Construction Services como gerente del programa de bonos de Measure S a través de un proceso competitivo de RFP, escuchó su enfoque de gestión enfatizando participación comunitaria e administración financiera, y recibió el primer reporte financiero de Measure S mostrando $90 millones en bonos de la Serie A vendidos en junio de 2023 con $728,770 en ingresos de intereses hasta diciembre y gastos mínimos hasta la fecha mientras las fases de planificación comienzan.",
      "summaryGeneratedAt": "2026-05-31"
    },
    {
      "date": "2023-11-14",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/may-11-2023-agenda-and-handouts-2",
      "handoutsUrl": null,
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/november-14-2023-minutes",
      "status": "past"
    },
    {
      "date": "2023-09-14",
      "youtube": "4-QHZIibVA8",
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/september-14-2023-agenda-and-handouts",
      "handoutsUrl": null,
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/september-14-2023-minutes",
      "title": "September 14, 2023 -- Citizens' Bond Oversight Committee",
      "status": "past",
      "transcriptKey": "cboc-2023-09-14",
      "hasTranscript": true,
      "duration": "2h 45m",
      "durationSeconds": 9942,
      "summaryEn": "CBOC reviewed Measure S bond program launch plans, including a $298 million bond approved in November 2022 with $90 million in Series A proceeds sold in June. The committee discussed the district's process for selecting and prioritizing projects through community input, a Master Facilities Plan update, and equity considerations, with board approval expected within 6 months.",
      "summaryEs": "El CBOC revisó los planes de lanzamiento del programa de bonos Measure S, incluyendo un bono de $298 millones aprobado en noviembre de 2022 con $90 millones en ganancias de la Serie A vendidas en junio. El comité discutió el proceso del distrito para seleccionar y priorizar proyectos a través de la participación comunitaria, una actualización del Plan Maestro de Instalaciones, y consideraciones de equidad, esperando aprobación de la junta dentro de 6 meses.",
      "summaryGeneratedAt": "2026-05-31"
    },
    {
      "date": "2023-05-11",
      "youtube": "F_bIShM89Bg",
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/may-11-2023-agenda-and-handouts",
      "handoutsUrl": null,
      "minutesUrl": "https://drive.google.com/file/d/1czerh8o9Jy8pCjLFYZxYH7U4Vh3PUZlU/view",
      "title": "May 11, 2023 -- Measure T Citizens' Bond Oversight Committee",
      "status": "past",
      "transcriptKey": "cboc-2023-05-11",
      "hasTranscript": true,
      "duration": "3h 43m",
      "durationSeconds": 13406,
      "summaryEn": "The Citizens' Bond Oversight Committee reviewed the independent financial and performance audits for fiscal year 2021–22, which showed clean opinions with no control deficiencies or audit findings. The committee approved amended bylaws clarifying roles and removing unnecessary procedural constraints, and issued the FY 2020–21 annual report. Discussion focused on sampling methodology for payroll transactions and the district's internal controls on charging employee salaries to bond funds.",
      "summaryEs": "El Comité de Vigilancia de Bonos Ciudadanos revisó los auditorías financieras e de desempeño independientes para el año fiscal 2021–22, que mostraron opiniones limpias sin deficiencias de control ni hallazgos de auditoría. El comité aprobó normas enmendadas que aclaran los roles y eliminan restricciones procedimentales innecesarias, e emitió el informe anual FY 2020–21. La discusión se enfocó en la metodología de muestreo para transacciones de nómina y los controles internos del distrito sobre la carga de salarios de empleados a fondos de bonos.",
      "summaryGeneratedAt": "2026-05-31"
    },
    {
      "date": "2023-02-02",
      "youtube": "A9QEGSzkuK0",
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/february-2-2023",
      "handoutsUrl": null,
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/february-2-2023-minutes",
      "title": "February 2, 2023 -- Measure T Citizens' Bond Oversight Committee Meeting",
      "status": "past",
      "transcriptKey": "cboc-2023-02-02",
      "hasTranscript": true,
      "duration": "2h 35m",
      "durationSeconds": 9313,
      "summaryEn": "The committee discussed Measure T bond construction closeout with substantial completion reached at three major projects; DSA certification expected by early summer. The committee also reviewed a 2020-21 annual report but voted against approval (4-3 vote failed to meet two-thirds threshold), requesting council clarification on what \"approval as to substance\" means before the next meeting.",
      "summaryEs": "El comité discutió el cierre de la construcción del bono Measure T con terminación sustancial alcanzada en tres proyectos grandes; se espera certificación DSA a principios del verano. El comité también revisó un informe anual 2020-21 pero votó en contra de la aprobación (la votación 4-3 no alcanzó el umbral de dos tercios), pidiendo que el abogado aclare qué significa \"aprobación en cuanto al fondo\" antes de la próxima reunión.",
      "summaryGeneratedAt": "2026-05-31"
    },
    {
      "date": "2022-10-27",
      "youtube": "8lU3HmcuhqI",
      "agendaUrl": "https://www.rcsdk8.net/fs/pages/6952",
      "handoutsUrl": null,
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/october-27-2022-minutes-regular-meeting",
      "title": "October 27, 2022 -- Measure T Citizens' Bond Oversight Committee Meeting",
      "status": "past",
      "transcriptKey": "cboc-2022-10-27",
      "hasTranscript": true,
      "duration": "2h 15m",
      "durationSeconds": 8111,
      "summaryEn": "The Citizens' Bond Oversight Committee elected new leadership and welcomed fresh members while discussing Measure T bond program progress. Nearly all projects—including Garfield, Orion Alternative, and Taft modernizations—are substantially complete with $195.3 million spent of $214.7 million authorized. The committee will schedule a site tour and reconvene December 8th to finalize the annual fiscal year 2021-22 report for board submission.",
      "summaryEs": "El Comité de Vigilancia de Bonos de Ciudadanos eligió nuevo liderazgo y recibió miembros nuevos mientras discutía el progreso del programa de bonos Measure T. Casi todos los proyectos—incluyendo las modernizaciones de Garfield, Orion Alternative, y Taft—están sustancialmente completos con $195.3 millones gastados de $214.7 millones autorizados. El comité programará una gira de inspección y se reunirá nuevamente el 8 de diciembre para finalizar el reporte anual del año fiscal 2021-22 para presentación a la junta.",
      "summaryGeneratedAt": "2026-05-31"
    },
    {
      "date": "2022-04-21",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/april-21-2022-agenda",
      "handoutsUrl": "https://drive.google.com/file/d/1QC_TBB65JQCyKERRCpA8IW7aAHVSKF_H/view",
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/april-21-2022-minutes",
      "status": "past"
    },
    {
      "date": "2021-12-16",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/december-16-2021-agenda",
      "handoutsUrl": "https://drive.google.com/file/d/15wo-Ni0cH9PDX6iQ_5mVcdKxFOSvmlZc/view",
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/december-16-2021-minutes",
      "status": "past"
    },
    {
      "date": "2021-09-23",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/september-23-2021-agenda",
      "handoutsUrl": "https://drive.google.com/file/d/1oZfASeqpqGDxeahV-O_wlQJ8tPSMvvpz/view",
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/september-23-2021-minutes",
      "status": "past"
    },
    {
      "date": "2021-04-15",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/april-15-2021-agenda",
      "handoutsUrl": "https://drive.google.com/file/d/1Usa1CZfdUBtNyCAOTtGv0GWIqjXU0ptk/view",
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/april-15-2021-minutes",
      "status": "past"
    },
    {
      "date": "2020-11-19",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/november-19-2020-agenda",
      "handoutsUrl": "https://drive.google.com/file/d/18HoyDS6w5ATNJfnQWz1CZOX0X86jYz84/view",
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/november-19-2020",
      "status": "past"
    },
    {
      "date": "2020-05-28",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/may-28-2020-agenda",
      "handoutsUrl": "https://drive.google.com/file/d/1-XNn1v7iM81mB0ON5jgztmteA8FcOr2D/view",
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/may-28-2020-minutes",
      "status": "past"
    },
    {
      "date": "2020-03-05",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/march-5-2020-agenda",
      "handoutsUrl": "https://drive.google.com/file/d/1tugqdcQRmBA79UMPZXyhn4GboiYLbcQp/view",
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/march-5-2020-minutes",
      "status": "past"
    },
    {
      "date": "2019-11-21",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/november-21-2019-agenda",
      "handoutsUrl": "https://drive.google.com/file/d/1PtDm2eqHhG56FIl7dPDfdhEQ-FlOyDfb/view",
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/november-21-2019-minutes",
      "status": "past"
    },
    {
      "date": "2019-05-30",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/may-30-2019-agenda",
      "handoutsUrl": "https://drive.google.com/file/d/19HEIkGau3MubizOmGp0YV3hNQGXnJ89C/view",
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/may-30-2019-minutes",
      "status": "past"
    },
    {
      "date": "2019-03-21",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/march-21-2019-agenda",
      "handoutsUrl": "https://drive.google.com/file/d/1fDvSimWJgqkJ3qSs7I0tDjDGKNoTjTq2/view",
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/march-21-2019-minutes",
      "status": "past"
    },
    {
      "date": "2018-11-15",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/november-15-2018-agenda",
      "handoutsUrl": "https://drive.google.com/file/d/1pJcJXObzxTrpqPUrWgS2ebskSVjJpX9f/view",
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/november-15-2018",
      "status": "past"
    },
    {
      "date": "2018-09-20",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/september-20-2018-agenda",
      "handoutsUrl": "https://drive.google.com/file/d/11XZXBhXOB6kmFkVipvYk3_RFcvHfjFxD/view",
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/september-20-2018",
      "status": "past"
    },
    {
      "date": "2018-05-31",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/may-31-2018-agenda",
      "handoutsUrl": "https://drive.google.com/file/d/12Wjv8bkLve5HFSzFrprMf7btLnMbVfB7/view",
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/may-31-2018",
      "status": "past"
    },
    {
      "date": "2018-03-01",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/march-1-2018-agenda",
      "handoutsUrl": "https://drive.google.com/file/d/14D80Uy9xEhN6ql5mBwTFyzXwsXCeUn31/view",
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/march-1-2018",
      "status": "past"
    },
    {
      "date": "2017-06-01",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/june-1-2017-agenda",
      "handoutsUrl": null,
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/june-1-2017",
      "status": "past"
    },
    {
      "date": "2016-11-03",
      "youtube": null,
      "agendaUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/november-3-2016-agenda",
      "handoutsUrl": null,
      "minutesUrl": "https://www.rcsdk8.net/our-programs-and-services/school-modernization-and-construction/phase-i-measure-t/measure-t-oversight-committee/november-3-2016",
      "status": "past"
    }
  ]
}